
1.Slab
2.Get some round blocks
a.The
slab should be finished
ready at hands.
within two hours
b.The
slab is made after.
c.The
slab cannot be made
by
machines.
d.Start
it again when the
making of slab takes more
than
three hours
3.Place the pressed slab flat
until it is leather-hard. Its thickness
should not be over 5cm. Pay more attention
to the time of holing. Apply the ground
glaze first

4.Put
the ropes of clay inside the slab
5.Make
four small holes convenient
in order to
prevent it from being deformed
for exhibiting.
The ground slab
when fired at
high temperature.
is
needed.

6.Color the characters on
the
7.Pay attention to the metals
piece with glazes and some of the
before firing. Remember to write
glazes are mixed with a little
down the signature and the date
slip. For some parts of the piece,
of making when glazing.
the second glazing will be done
after the first layer of glazes are
dried.Mix it with slip and metal
and fire it at
1100℃
in reduction.
8.Exhibition
Planning One: The
9. Exhibition Planning Two.
distance between platforms
should
be enough for three
visitors at the same time.
_small1.jpg)
10.Exhibition
Planning Three:
11.Exhibition
Planning Four:the
pieces
from
the wall to the floor.
are grouped together one by
one
It
will cover a broader
according to the specific exhibition
floor and create a sensation.
halls.
|